Take a look at some of our recent projects

70 Mark Lane.jpg
imageedit_1_4161741333.png

Offices

20170307_104954.jpg
imageedit_1_4161741333.png

Residential

Modern Apartment Block
imageedit_1_4161741333.png

Multi Residential 

Modern Apartment Block
imageedit_1_4161741333.png

Retail

 

Claremont Park, Esher

Pre-acquisition survey 

Non-intrusive site survey, flow rate and pressure checks.

 

Review of certificates and O&M manuals.

Issue of findings report and snagging list.

Remedial works inspection and sign off.

Luxury house
Pre-acquisition survey
Condition survey
Pre-Acquisition
Lighting Control
Cold water booster set
How water cylinder
External condenser

Surrey

Services design for a luxury high specification private residence​

Services design

 

Services coordination

 

Site inspections

 

Commissioning and sign off

 

 

 
M&E Design
Underfloor Heating
Building Services
Electrical Distribution
Fire Alarms

Kent Science Park, HUB, Sittingbourne

Full MEP Design

The new HUB building is a 2-storey structure designed to house a café facility and management offices with meeting rooms.

iTS provided a full MEP design including incoming utilities, existing services diversions, small power, lighting, fire alarms, heating, cooling, ventilation, domestic water services and drainage. 

Funko, European HQ, London

Full M&E Design

Funko’s European head office is based in Hammersmith, London. This brand-new, state-of-the-art office is 5,207 sq. ft. in size, and is an open-plan, collaborative working space for the Funko team. It’s centerpiece is a showroom exhibiting many of Funko's new and upcoming products.

iTS provided a full MEP design including power, lighting, fire alarms, heating, cooling, ventilation, domestic water services and drainage. 

DALI Lighting Control
Electrical Schematics
Feature Lighting Design
Smart Lighting Control

Roger Needham Building, Cambridge

Multi-storey office building

iTS is an approved consultant for The University of Cambridge

 

Survey and feasibility report on the replacement of lighting and controls

 

 

 

Project Location: 70 Mark Lane, London EC3R 7HT

 

Project Size: 2,500m²

Services Value: £780,000

Project description: CAT B office fit-out over three floors including grand reception area, flexible meeting rooms, individual offices, open plan office spaces, tea points, comms room and outside terrace space.

Services provided: Design from RIBA Stage 2 through to RIBA Stage 4 for MEP services.

During the design stages iTS coordinated with the buildings landlord to ascertain the CAT A provisions along with the interface procedures. iTS attended various coordination meetings with the architect, client and specialist subcontractors to ensure all elements were managed and accounted for within iTS’s tendered design. This included coordination with sprinklers, gas suppression, audio visual and access control specialist contractors.

Electrical consultant
Lighting refurbishment
Electrical Design
Mechanical design
 
 
Building Services Engineers
3D Modelling
3D Modeling
3D Design

Hanover Square, London

Feasibility study and concept design for recording studio in listed building

Building services consultant, building services engineer, M&E consultant, MEP consultant

3D modelling

 

Services design

 

Site inspections

 

 

Sanger Buildingi
Data Rack
Rack mounted UPS

University of  Cambridge, Sanger Building  

10 Gigabit network infrastructure upgrade

Survey and Feasibility Study 

Electrical, Data, Mechanical and Structural Design 

Project management, Principle Designer (CDM), Contract Administration

Sandringham School, St Albans

New 1,730m2 teaching block including science laboratories

Incoming services feasibility report

 

Services design

 

Site inspections

 

Commissioning and sign off

 

 

 
Aire Source Heat Pump Design
Solar panel design
office fit-out
School Building Services
Dado trunking

Building services consultant, building services engineer, M&E consultant, MEP consultant, Building services consultants  

iTS Consultancy
MEP Design
New Balance Bicester Village
New Balance Bicester Village
iTS Consultancy
iTS Consultancy

New Balance, Bicester Village

Full MEP design 

Building services consultant, building services engineer, M&E consultant, MEP consultant

Heating, Cooling, Ventilation, Power and Lighting Design 

 

Site inspections throughout program 

 

Witness commissioning and sign-off 

 
 
Site
Lighting
Site plan
Site services

Beck Retail Park, Wakefield

Full refurbishment of existing retail park

Statutory services diversions

 

Sub-station relocation

 

Car park lighting design

 

Landlord’s services

 

 

 

Priory Point, Bedford

Manufacturing Facility

Survey and condition report

 

Assessment of maximum demand capacities

 

 

HV Electrical
Building Services Bedfordshire
Building Services London
Air Conditioning Design
Ventilation Design
 
Fit-out
Building Services
Electrical Design
Mechanical Design

Chancerygate Business Centre, Hemel Hempstead

Complete fit out design​

Project management

 

Services Design

 

Site inspections

 

Commissioning and sign off

 

 

Marina House, South Maudsley

Health Clinic

Survey and condition report

 

Feasibility study and report on replacement heating, cooling and ventilation

 

Design of replacement heating, cooling and ventilation

 

Commissioning and sign off

Survey
Condition Survey
Chiller
HVAC